Wednesday, 30 November 2016
Tuesday, 29 November 2016
Unit 23: Multi-Camera Techniques - Lighting Plan
Lighting plan
*Black out *
Front lights fade in (5 AND 6) in and is on the host (use low key light)
Host introduces himself/herself …….
Host introduces the guest …….
After induction
light s 5 & 6 fade down
Lights 1&2 on when host introduces them
Then lights 3&4 on when guest introduces them
Host: both teams will be competing to see who has the better social thumb…………
* All studio lights turn on * (lights 1,2,3,4,,5 and 6)
Host : The first game is called meme generator ….
Host : are you ready ?
*dim down front lights 5 & 6*
Teams respond
Host: Here is your first image ………..
(image comes on screen)
*dim down lights for 15 seconds 1,2,,3,and 4 so we can see the image
*after 15 seconds put back lights 1,2,3,4
Host: time’s up ,let’s see your memes
*dim down lights 1,2,3,4*
Host: ohh it’s a tough one but team two in the first round
When the host has finished talking put back lights 1234
Host: Here is your image for your second meme
*all light go down so we can see the screen for 10 seconds *
(images come on screen)
Host : times up ….
Host :so this is your final round of memes
You ready
*lights go off again for 10 seconds *
(images come on screen)
After 10 seconds all lights come back on
Host: the winner is team one …
*Lights 3,4 ,5,6 dim down*
*Lights 1, 2 for team 1 as spot lights because they are the winning team*
Host: So that’s the end of round 1 we will be back after the break …….
(blackout advert on )
All lights 1,2,3,4,5,6 back on
host : hello and welcome back…….,.
Host: team one you have to create a snap story ……
*all lights are still on*
Ready set go
The team make a dub challenge …
*all lights dim down* spot light is on the host
Host announces the winner
Team one speak
*spotlight on team one *
Host speaks ……..
All light are back on
Team 2 speak lights 3 and 4 used as spotlight
All lights back on after team 2 speaks
Host: we run out of time
Show ends blackout
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 7 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 7 - 28/11/16 9:00am
| This morning as a group we discussed deadlines and how it could be complete by Wednesday 30th . Berfin asked anyone who needed help or support with their pre-production and distributed any work between Victor, Maarya and Berfin as they are done.
Lighting Plan - Berfin
Set Design & Proplist - Dani
Secondary Research - Dani |
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 6 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 6 - 15/11/16 10:20am
|
In this reporting meeting, we spoke about what had to be done and when.
Tasks that needs to be completed
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Keeley- Primary Research Evidence , script
Chai-ann- Shooting- Camera Script
Timi - Linking and inserts, script
Zak- Shot list, Logo
Abigail - Production Schedule, Lighting Plan |
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 5 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 5 - 14/11/16 9:00am
| This morning we discussed what was complete for the pre-production.For an example, Berfin, Victor, Zak and Maarya was done with their individual task and started to work with other. Another example, Berfin is starting and designing the logo with Zak.
Complete Pre-production
Berfin - Budget & Reece
Victor - Equipment & Reece
Maarya - Storyboard
Zak - Studio Floor Plan |
Monday, 28 November 2016
Thursday, 24 November 2016
Wednesday, 16 November 2016
Unit 23: Multi-Cam Production - Budget
| Expenses & Jobs roles | Amount of No. | Price of Each | Total |
| Rent studio | 1 | £40 Per Hour | (10hr) £400 |
| Equipments E.g Cameras, | 5 ipads | £379 | £1,895 |
| Food | 0 | £0 | £0 |
| Travel | 0 | £0 | £0 |
| Costumes/ Materials | 0 | £0 | £0 |
| Producers | 1 | £195 (Per Hr) | 1,950 |
| Director | 2 | £155 (Per Hr) | £1,550 |
| Cast | 7 | £15 (Per Hr) | £1,050 |
| Production Staff | 9 | £25 (Per Hr) | £2,250 |
| Camera Operator | 3 | £45 (Per Hr) | £1,350 |
| Lighting Techician | 1 | £25 (Per Hr) | £250 |
| Production Manager | 1 | £35 (Per Hr) | £350 |
| Script Supervisor | 2 | £65 (Per Hr) | £1,300 |
| Costume Design | 1 | £24 (Per Hr) | £240 |
| Hair/Make up | 1 | £24 (Per Hr) | £240 |
| Editor | 4 | £65 (Per Hr) | £2,600 |
| Sound Operator | 1 | £35 (Per Hr) | £350 |
| Floor Manger | 1 | £25 (Per Hr) | £250 |
| £16,025 | |||
| Budget = £20,000 |
Monday, 14 November 2016
Unit 23: Multi-Camera Techniques Brief - Studio Diary (14/11/16)
Dear Diary
(14/11/16)
Today is the deadline and most of the work was upload to our bloggers and our google drive. For and example, Dani had completed the props list and set design( including logos) and the secondary research evidence so we added that to our bloggers. Some of the team members didn't work as hard as others and left everything to the end. As an example, Keeley had the role of primary research and script and she didn't want any help from us so she fell behind. For that reason Timi tried to help her. Overall, we had missed the deadline with lot of the work missing or uncompleted, because certain peoples lack of work during the weeks of pre-production given.
(14/11/16)
Today is the deadline and most of the work was upload to our bloggers and our google drive. For and example, Dani had completed the props list and set design( including logos) and the secondary research evidence so we added that to our bloggers. Some of the team members didn't work as hard as others and left everything to the end. As an example, Keeley had the role of primary research and script and she didn't want any help from us so she fell behind. For that reason Timi tried to help her. Overall, we had missed the deadline with lot of the work missing or uncompleted, because certain peoples lack of work during the weeks of pre-production given.
Wednesday, 9 November 2016
Unit 23: Multi-Camera Techniques Brief - Studio Diary (09/11/16)
Dear Diary
(09/11/16)
As we got closer to the deadline, I took on the responsible
to see what had to be done. I have complete my individual task and
pre-production and I moved on helping Zak with the studio plan. This way we
completed more pre-production at once so when the all pre-production is fully
completes we can finally move on record our inserts and designing our INDE.
The following we completed.
Berfin - Budget &
Reece/ Reporting Meeting (Ongoing)
Victor - Equipment & Reece
Maarya –
Storyboard
Zak - Studio Floor Plan
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 4 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 4 - 09/11/16 11.10am
|
Today we discuss the main part of the pre-production as we had a deadline on the 14th of November. Everyone team member given a little update where they were on the pre-production.
Storyboard
Equipment check
Research evidence
Location recce
|
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 3 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 3 - 08/11/16 11.40am
|
This week we decided as a group to give out individual
al task.
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post), Reece, Logo
Keeley- Primary Research Evidence , script
Victor - Shooting- Camera Script, Equipment checklist , Reece
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script
Timi -Linking and inserts, script
Zak- Shot list, Studio floor plans, Logo
Abigail - Production Schedule, Lighting Plan |
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 2 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 2 - 02/11/16 10:20am
|
We had our second meeting where we discuss our TV show and the different types of close we can use and includes in our show. For an example,we liked the idea of having close up of the iPad in the show and most likely we will need to pre-record these clips and insert them on the production day.
|
Unit 23: Multi-Camera Techniques Brief - Regular Production Week 1 Berfin Tunc
Date & Time
|
Discussion and Topic of the meeting
|
Week 1 -31/10/16 10:20am
|
This was our first meeting as a group. We discussed what the content of the show was and how we can set up the TV room for it. Overall, we plan what each role was and what had to be done for it.
Sourced from Keeley’s Blogger
my idea is to use social media to create a game show, there will be two teams of three and each team will compete to create funny and creative images and videos using social sites such as snapchat, tumblr and music.ly. the ages will range from 15-25 and the watershed will be from 9:30pm.
|
Monday, 7 November 2016
Unit 23: Multi-Camera Techniques Brief - Studio Diary (07/11/16)
Dear Diary
7/11/16
Today as a group we had to allocated the team individual
roles and then discussed more in detail about the task set for each roles
taking into consideration cross overs.
I took the role of
budgeting, reporting meeting and helping with Reece and risk assessment.
This week we decided as a group to give out individual task.
Dani - Props list and set design( Including logos) &
Secondary Research Evidence
Berfin
- Budget & Regular Production Meeting (Regular blog post)
Keeley- Primary Research Evidence , script
Victor - Shooting- Camera Script, Equipment checklist
Victor - Shooting- Camera Script, Equipment checklist
Maarya-
Storyboard & Risk Assessment
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Location Recce, Linking and inserts
Zak- Shot list, Studio floor plans
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Location Recce, Linking and inserts
Zak- Shot list, Studio floor plans
Abigail -
Production Schedule, Lighting Plan
Tuesday, 1 November 2016
Unit 23: Multi-Camera Techniques Brief - Friday day in the Studio (01/11/16)
Dear
Diary...
(01/11/16)
Today we had
a test run of a TV show with our college media teacher Tom. He give us a
overall brief about the TV show, where some equipment's are stored and how it
runned by the control room. As a group we had to understand the different all
elements of TV Production. For an example, the control room, sound desk to
director and the actual Set and design of the studio, of 3 camera set up, green
screen and TV Monitor.
In the
control room, we looked at different element such as the lighting desk (turning
up or down the lighting depending on the shot and movement), Sound (FX- adding
music on the vision mixer desk and placing the following sound to sound mixer,
to certain parts of programme would follow camera script and the vision mixer (working
with the director and multiple assistants to switch cameras and VT).
We each got
the chance to change roles from director, floor manager and many more roles. I
had a little taster from each of the different roles titles and the responsible
that is needed for the show to run effective. I really like the job role of
cameraman and sound. I believe I would good at cameraman as I understand a
range of camera shot and movement that will be required, but I would also like
to be the floor manager and the director as well.
On Set:
Camera Operator - Film the shots from Directors request and
liaison with floor manager
Sound - Sound would be on hand with mics to capture sound from set
Floor Manager - Responsible for the running of set,
respond to director's calls for action
Gaffer - Lighting crew who are on set to change or replace lights.
Actors/Presenters - Follow direction of floor manager, read
auto cue and also listen to producers and director.
Subscribe to:
Comments (Atom)









